The engineering cycle is an important factor that the construction party is concerned about. Taking a shielded room of 20-30 square meters as an example, it is briefly explained that the design drawings take 3 days, workshop production takes 7 days, on-site installation takes 15 days, and transportation time is generally around 30 days.